Research Article

Construction Quality Control Study of Double-Layer Continuous Paving for Large-Thickness Cement-Stabilized Base

Table 3

Pull test results of interlayer bonding.

Simulation typeSpecimen numberUltimate pull-off force (kN)Pull-off strength (MPa)Strength average value (MPa)

Double-layer discontinuous paving#10.30.110.09
#20.20.07
#30.30.11

Double-layer continuous paving#40.50.180.19
#50.50.18
#60.60.21

Control group#71.10.390.4
#81.20.42
#91.10.39