Research Article

Construction Quality Control Study of Double-Layer Continuous Paving for Large-Thickness Cement-Stabilized Base

Table 5

Test results of embedding depth under different curing times.

NumberCuring time (h)Test results (mm)Average value (mm)

#104.13.84.34.1
#232.93.43.63.3
#362.53.22.62.8
#4240.50.20.60.8