Research Article
Digital Twin Hospital Buildings: An Exemplary Case Study through Continuous Lifecycle Integration
Table 1
A nonexhaustive list of integration contents during lifecycle phases.
| | Static data | Dynamic information | Diagnosis model |
| Design phase | Geometry of building elements | — | Consistency check from drawings to BIM | ▲Space division |
| Construction phase | Material information | Continuous changes to the original designs | — | ▲Factory information of important machinery | Position points of sensor devices and cameras | Pre-O&M phase | ▲Control logic of HVAC systems | — | Range of influence analysis |
| O&M phase | Repair knowledge | BA monitoring data | Abnormal electric usage detection | Maintenance requirements | Energy consumption | Air-handling unit fault prediction | | Repair business system | Frequent repair pattern recognition | | Systems for medical use | | | Real-time weather | |
|
|
“▲” denotes data that ensure consistency in subsequent phases or final DT.
|