Journals
Publish with us
Publishing partnerships
About us
Blog
Advances in Civil Engineering
Journal overview
For authors
For reviewers
For editors
Table of Contents
Special Issues
Advances in Civil Engineering
/
2020
/
Article
/
Tab 7
/
Research Article
Experimental Study on the Soil Conditioning Materials for EPB Shield Tunneling in Silty Sand
Table 7
Relationship between slurry injection ratio and advance distance.
Advance distance (mm)
0–30
31–60
61–90
91–120
121–150
151–180
181–210
211–240
Injection ratio (%)
0
3–5
7–8
10–12
14–16
18–20
24–26
28–30