Research Article

A Prioritization Model of Strategies for Small and Medium Firms in Less-Developed Countries: A Tanzania Case

Table 8

Ranking of prioritized strategies for performance improvement.

CodeStrategiesMeanStd. deviationRanking

OS1Establish and provide support to firms to access finance and loan4.490.651
SCP10Resource (finance, schedule, material, and equipment) management4.460.652
SCP12Select a competent, experienced, and accessible contractors4.430.583
SCP1Employ a competent design expert4.420.954
SCP4Allocate a balanced design resources4.410.625
OS19Employ competent and technical employees4.400.626
OS6Facilitate training for capacity building4.400.667
OS7Adopt joint venture and partnership with overseas firm4.390.728
OS11Ensure resource availability, allocation, and utilization4.381.009
SCP21Gather a complete design requirement for client and stakeholders4.370.7510
SCP7Adherence to procurement ethics and code of conduct4.350.7111
SCP2Integrate design team with another related department4.330.7812
OS5Optimization of local quality construction materials4.310.6513
OS3Adhere to low-firm operational cost4.300.5814
OS4Invest on technology and establish technology transfer centre4.290.8015
OS18Establish construction equipment centre4.270.7116
SCP15Reviewing the conflicting procurement policy, laws, and regulations4.250.8417
OS13Penalizing and blacklist firms engaged in malpractices4.240.9518
SCP11Adopt an electronic-procurement system to reduce a bidding cycle time4.210.8119
SCP18Quality assurance (standard and specification)4.171.0920
OS17Policy on compulsory joint venture4.140.8321
OS2Ensure employee’s good working environment4.140.9222
OS12Training certification by government4.120.8323
OS9Enforce tax reduction policy of imported construction equipment and materials4.090.6924
OS8Policy formulation of construction bank establishment4.050.7325
SCP16Adoption of modern construction technique4.040.7926
OS10Enhance networking to share experience4.010.8027
SCP20Recognize and motivate the design expert3.630.6928
SCP3Abide to design standard and specification3.630.8529
SCP5Develop a design process management protocol3.581.0330
SCP6Adopt constructability concept to avoid reworks3.530.8831
SCP14Provide enough information on contract specification and conditions3.510.8132
SCP13Categorize works to identify appropriate contract type3.470.7733
SCP8Information, communication, and record management3.431.1334
SCP9Contract, risk, and dispute management3.410.8135
SCP19Reduce waste and adopt a sustainable construction3.371.7736
OS14Ensure resource upgrading or improving3.360.8537
OS15Timely strategy review3.330.8438
OS16Ensure client satisfaction3.280.9839
SCP17Healthy, safety, and welfare management3.230.6940

Note: OS1, 4, 19, 5, and 18 represent resources; OS6, 10, and 7 represent capacity building; OS17, 12, 9, and 8 represent government policy; OS11, 3, 13, and 2 represent operational and management; SCP1, 21, 4, and 2 represent design; SCP15, 11, and 7 represent procurement.