| Code | Strategies | Mean | Std. deviation | Ranking |
|
| OS1 | Establish and provide support to firms to access finance and loan | 4.49 | 0.65 | 1 |
| SCP10 | Resource (finance, schedule, material, and equipment) management | 4.46 | 0.65 | 2 |
| SCP12 | Select a competent, experienced, and accessible contractors | 4.43 | 0.58 | 3 |
| SCP1 | Employ a competent design expert | 4.42 | 0.95 | 4 |
| SCP4 | Allocate a balanced design resources | 4.41 | 0.62 | 5 |
| OS19 | Employ competent and technical employees | 4.40 | 0.62 | 6 |
| OS6 | Facilitate training for capacity building | 4.40 | 0.66 | 7 |
| OS7 | Adopt joint venture and partnership with overseas firm | 4.39 | 0.72 | 8 |
| OS11 | Ensure resource availability, allocation, and utilization | 4.38 | 1.00 | 9 |
| SCP21 | Gather a complete design requirement for client and stakeholders | 4.37 | 0.75 | 10 |
| SCP7 | Adherence to procurement ethics and code of conduct | 4.35 | 0.71 | 11 |
| SCP2 | Integrate design team with another related department | 4.33 | 0.78 | 12 |
| OS5 | Optimization of local quality construction materials | 4.31 | 0.65 | 13 |
| OS3 | Adhere to low-firm operational cost | 4.30 | 0.58 | 14 |
| OS4 | Invest on technology and establish technology transfer centre | 4.29 | 0.80 | 15 |
| OS18 | Establish construction equipment centre | 4.27 | 0.71 | 16 |
| SCP15 | Reviewing the conflicting procurement policy, laws, and regulations | 4.25 | 0.84 | 17 |
| OS13 | Penalizing and blacklist firms engaged in malpractices | 4.24 | 0.95 | 18 |
| SCP11 | Adopt an electronic-procurement system to reduce a bidding cycle time | 4.21 | 0.81 | 19 |
| SCP18 | Quality assurance (standard and specification) | 4.17 | 1.09 | 20 |
| OS17 | Policy on compulsory joint venture | 4.14 | 0.83 | 21 |
| OS2 | Ensure employee’s good working environment | 4.14 | 0.92 | 22 |
| OS12 | Training certification by government | 4.12 | 0.83 | 23 |
| OS9 | Enforce tax reduction policy of imported construction equipment and materials | 4.09 | 0.69 | 24 |
| OS8 | Policy formulation of construction bank establishment | 4.05 | 0.73 | 25 |
| SCP16 | Adoption of modern construction technique | 4.04 | 0.79 | 26 |
| OS10 | Enhance networking to share experience | 4.01 | 0.80 | 27 |
| SCP20 | Recognize and motivate the design expert | 3.63 | 0.69 | 28 |
| SCP3 | Abide to design standard and specification | 3.63 | 0.85 | 29 |
| SCP5 | Develop a design process management protocol | 3.58 | 1.03 | 30 |
| SCP6 | Adopt constructability concept to avoid reworks | 3.53 | 0.88 | 31 |
| SCP14 | Provide enough information on contract specification and conditions | 3.51 | 0.81 | 32 |
| SCP13 | Categorize works to identify appropriate contract type | 3.47 | 0.77 | 33 |
| SCP8 | Information, communication, and record management | 3.43 | 1.13 | 34 |
| SCP9 | Contract, risk, and dispute management | 3.41 | 0.81 | 35 |
| SCP19 | Reduce waste and adopt a sustainable construction | 3.37 | 1.77 | 36 |
| OS14 | Ensure resource upgrading or improving | 3.36 | 0.85 | 37 |
| OS15 | Timely strategy review | 3.33 | 0.84 | 38 |
| OS16 | Ensure client satisfaction | 3.28 | 0.98 | 39 |
| SCP17 | Healthy, safety, and welfare management | 3.23 | 0.69 | 40 |
|