Research Article
Comparative Study of the Excavation Damage and Rockburst of the Deeply Buried Jinping II Diversion Tunnels Using a TBM and the Drilling-Blasting Method
Figure 3
Construction design drawing of Jinping II diversion tunnels: (a) excavation sections of the diversion tunnel by the TBM or drilling-blasting method, (b) typical cross section of the diversion tunnel excavated by the TBM, and (c) typical cross section of the diversion tunnel excavated by drilling and blasting.
(a) |
(b) |
(c) |