Research Article

Comparative Study of the Excavation Damage and Rockburst of the Deeply Buried Jinping II Diversion Tunnels Using a TBM and the Drilling-Blasting Method

Figure 3

Construction design drawing of Jinping II diversion tunnels: (a) excavation sections of the diversion tunnel by the TBM or drilling-blasting method, (b) typical cross section of the diversion tunnel excavated by the TBM, and (c) typical cross section of the diversion tunnel excavated by drilling and blasting.
(a)
(b)
(c)