Research Article

Comparative Study of the Excavation Damage and Rockburst of the Deeply Buried Jinping II Diversion Tunnels Using a TBM and the Drilling-Blasting Method

Figure 4

A schematic diagram of testing holes arrangements in diversion tunnels: (a) for TBM sections and (b) for drilling-blasting sections.
(a)
(b)