Research Article

Comparative Study of the Excavation Damage and Rockburst of the Deeply Buried Jinping II Diversion Tunnels Using a TBM and the Drilling-Blasting Method

Figure 6

Typical cross sections of relaxation ranges measured by acoustic monitoring for rock mass of 1#–4# diversion tunnel: (a)∼(d) nearby k14 + 500 m, (e)∼(h) nearby k15 + 200 m, and (i)∼(l) nearby k15 + 600 m.
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)
(j)
(k)
(l)