Comparative Study of the Excavation Damage and Rockburst of the Deeply Buried Jinping II Diversion Tunnels Using a TBM and the Drilling-Blasting Method
Figure 6
Typical cross sections of relaxation ranges measured by acoustic monitoring for rock mass of 1#–4# diversion tunnel: (a)∼(d) nearby k14 + 500 m, (e)∼(h) nearby k15 + 200 m, and (i)∼(l) nearby k15 + 600 m.