HSE Risk Assessment of Major Sewage Transport Tunnel Projects at the Construction Stage Based on the StructuralEntropy Weight Method and the Cloud Model

Table 1

Identification results of HSE risk indicators.

Criteria layerPreliminary indicatorReferences

HealthConstruction noise[21]
Construction dust[22]
Humid environment[23]
High ambient temperature[23]
Irregular lifestyle[24]
Toxic and harmful chemicals[7]
Whole body vibration[7]
Radiation[25]

SafetyUnreasonable tunneling parameters[26]
Excessive deformation[26]
Improper use of transportation[2]
Wear failure of the shield cutter head[27]
Improper power utilization[28]
Unqualified shield segments[29]
Improper operation of shield segments[30]
Random stacking[2]
Incorrect protection[31]
Failure of bearing seal[32]
Failure of hoisting jack[32]
Clogging at the exit of slurry[32]
Bad grouting effect[32]
Improper selection of TBM machine[33]
Inadequate fastening of bolt[34]
Anchor bolt quality[34]
Imprecise installation of launching base[34]
Deviation of TBM from target shaft[34]
Formation of “mud cake” during excavation[34]
Derailment or collision of electric cart[34]
Grout pipe blockage[34]
Improper grouting amount[34]
Improper control of grouting coefficient[34]
Leakage of pipe piece joints[35]
Shield tail seal leakage[35]
Segment seal failure[36]

EnvironmentDomestic waste pollution[37]
Exhaust pollution[38]
Wastewater pollution[37]
Sludges and muds pollution[39]
Pollution from vehicles[40]
Impact on groundwater level[41]
Excessive surface subsidence[42]
Destruction of the ecological structure[43]