Advances in Civil Engineering / 2020 / Article / Tab 1 / Research Article
HSE Risk Assessment of Major Sewage Transport Tunnel Projects at the Construction Stage Based on the StructuralEntropy Weight Method and the Cloud Model Table 1 Identification results of HSE risk indicators.
Criteria layer Preliminary indicator References Health Construction noise [21 ] Construction dust [22 ] Humid environment [23 ] High ambient temperature [23 ] Irregular lifestyle [24 ] Toxic and harmful chemicals [7 ] Whole body vibration [7 ] Radiation [25 ] Safety Unreasonable tunneling parameters [26 ] Excessive deformation [26 ] Improper use of transportation [2 ] Wear failure of the shield cutter head [27 ] Improper power utilization [28 ] Unqualified shield segments [29 ] Improper operation of shield segments [30 ] Random stacking [2 ] Incorrect protection [31 ] Failure of bearing seal [32 ] Failure of hoisting jack [32 ] Clogging at the exit of slurry [32 ] Bad grouting effect [32 ] Improper selection of TBM machine [33 ] Inadequate fastening of bolt [34 ] Anchor bolt quality [34 ] Imprecise installation of launching base [34 ] Deviation of TBM from target shaft [34 ] Formation of “mud cake” during excavation [34 ] Derailment or collision of electric cart [34 ] Grout pipe blockage [34 ] Improper grouting amount [34 ] Improper control of grouting coefficient [34 ] Leakage of pipe piece joints [35 ] Shield tail seal leakage [35 ] Segment seal failure [36 ] Environment Domestic waste pollution [37 ] Exhaust pollution [38 ] Wastewater pollution [37 ] Sludges and muds pollution [39 ] Pollution from vehicles [40 ] Impact on groundwater level [41 ] Excessive surface subsidence [42 ] Destruction of the ecological structure [43 ]