HSE Risk Assessment of Major Sewage Transport Tunnel Projects at the Construction Stage Based on the StructuralEntropy Weight Method and the Cloud Model

Table 12

Evaluation results of the Donghu Deep Tunnel Project.

Risk levelLower riskLow riskMedium riskHigh riskHigher risk

Membership0.0000.11070.59310.27870.0175