Research Article

HSE Risk Assessment of Major Sewage Transport Tunnel Projects at the Construction Stage Based on the StructuralEntropy Weight Method and the Cloud Model

Table 2

The index system for the HSE risk assessment of MSTTPs.

Criteria layerIndicator layerIndicator interpretation

HealthConstruction noise H1Shield machines and vehicles in tunnels generate noise, which can give hearing damage to construction workers.
Humid environment H2The humidity in the tunnel is exceedingly high, which may lead to skin dipping and erosion of construction workers.
High ambient temperature H3Excessive ambient temperature may cause heatstroke in workers.
Toxic and harmful chemicals H4Cement, paint, and other items may cause workers to suffer from occupational diseases such as contact dermatitis.

SafetyExcessive deformation S1Excessive deformation leads to the destruction of the original structure, leading to safety accidents.
Improper power utilization S2If the temporary power management is improper, it may easily give rise to an electric shock accident.
Improper operation of shield segments S3The improper operation of the construction personnel would end up in segments falling, causing object strike accidents.
Imprecise installation of launching base S4The launch base was installed incorrectly and the shield machine could not launch normally, resulting in a safety accident.

EnvironmentDomestic waste pollution E1Domestic waste in office and living areas may cause damage to the surrounding environment.
Exhaust pollution E2The construction of tunnels uses a lot of machinery, and waste gas will be generated during use. If it is not properly treated, it will pollute the atmosphere.
Sludges and muds pollution E3Due to inexperience, it is difficult to achieve zero discharge of construction waste such as engineering sludges and muds.
Impact on groundwater E4The earth pressure is not set properly, which may compact the surrounding soil and cause the groundwater level to rise significantly.
Excessive surface subsidence E5During the construction of the shield, the surrounding soil is disturbed greatly, and the ground surface has a large settlement.