Research Article

HSE Risk Assessment of Major Sewage Transport Tunnel Projects at the Construction Stage Based on the StructuralEntropy Weight Method and the Cloud Model

Table 3

Standard risk level classification and corresponding cloud models.

Risk levelStandards

Lower risk12.510.6160.5
Low risk37.510.6160.5
Medium risk62.510.6160.5
High risk82.56.3690.5
Higher risk95.04.2460.5