Advances in Civil Engineering / 2020 / Article / Tab 8 / Research Article
HSE Risk Assessment of Major Sewage Transport Tunnel Projects at the Construction Stage Based on the StructuralEntropy Weight Method and the Cloud Model Table 8 The clouds of evaluation factors.
Indicator Average score Ex En He H1 78.80 78.80 7.798650 1.617801 H2 84.84 84.84 5.120245 0.503215 H3 56.56 56.56 8.103378 2.329037 H4 73.96 73.96 8.556462 0.003187 S1 70.48 70.48 6.639879 2.580660 S2 55.48 55.48 7.008761 0.473030 S3 71.24 71.24 6.864416 0.826566 S4 79.44 79.44 6.287035 0.010070 E1 66.80 66.80 9.021574 2.986067 E2 61.84 61.84 7.483897 2.767690 E3 52.28 52.28 9.657094 3.233065 E4 54.48 54.48 6.371236 3.124658 E5 56.60 56.60 9.342341 2.485330