Research Article
Research on the Deformation and Control Technology of Surrounding Rock in Entry Retaining along the Gob Side
Table 5
The details of the grouting parameters.
| | Related indicators | Parameters |
| | Grouting material | Jinan reinforcement I | | Grouting form | Deep and shallow hole grouting | | Grouting hole layout | Three-two layout | | Grouting pressure | 0.7 MPa (shallow hole), 2 MPa (deep hole) | | Grouting time per hole | 600 s |
|
|