| Mileage (m) | Description of roadway damage |
|
| 15∼17 | Flexible formwork wall is inserted upward |
| 23, 24, 58 | The coal body at the bottom of the coal pillar side is extruded 30–50 cm, and the ladder beam is broken. |
| 69 | Fracture of the ladder beam in coal pillar side. |
| 78 | Flexible formwork wall bulge phenomenon. |
| 82∼84, 100 | Fracture of the ladder beam in coal pillar side. |
| 103∼105 | Metal net at the lower part of coal pillar side cracking, ladder beam fracture, and flexible formwork wall cracking. |
| 113 | The bolt of the coal pillar side failed, and the cables were laid beside it. |
| 118 | Fracture of the ladder beam near the second bolt at the bottom of coal pillar side. |
| 132∼138 | Cracking of entry floor. |
| 151∼154 | Two bolts in the middle of coal pillar side are pulled out by the mining stress. |
| 163 | Anchoring cable for pillar reinforcement has been removed in later period. |
| 175∼180 | Extrusion and crushing at shoulder corner of the roof and coal pillar side is serious. |
| 188 | Unanchoring of the third bolt from the bottom of the coal pillar side. |
| 190–214 | Cracking of entry floor. |
| 198∼201 | Four rows of ladder beams were broken in the middle and lower parts of coal pillar side. |
| 213 | The flexible formwork wall cracks in a 3-square range, the ladder beam at the bottom of the coal pillar side was broken, and the roof protruded seriously. |
| 221 | Two failure bolts in the middle of coal pillar side. |
| 229∼232 | The upper and lower parts of the flexible formwork wall fall into the bag. The height is 1.2 meters, and the length is 4.5 meters. |
| 239 | The second bolt dynamometer reading at the bottom of the coal pillar wall is 24 MPa, which is abnormal; the flexible formwork wall cracks, and the middle part falls into the bag. |
| 247∼253 | The damage and deformation of coal pillar side are serious, which are mainly affected by primary mining and adjacent chambers. |
| 259∼267 | Roof breakage and subsidence are very serious, especially near the side of the coal pillar. |
| 276 | Unanchoring of the third and fourth bolts from the bottom of the coal pillar side. |
| 296 | Unanchoring of the third bolt from the bottom of the coal pillar side. |
| 308 | Unanchoring of the second bolt from the bottom of the coal pillar side. |
| 311, 312 | Unanchoring of the second bolt from the bottom of the coal pillar side. |
| 320∼350 | The upper part of flexible formwork wall badly bulge phenomenon. |
| 334∼336 | Flexible formwork wall with bulge phenomenon, bulging range is 2 meters. |
| 352∼355 | Cracking of the flexible formwork wall is serious. |
| 358 | The second repaired cable at the bottom of the coal pillar side has failed. |
| 399∼406 | Cracking of entry floor. |
| 413∼422 | There are timbers to strengthen support in this area, and there are chambers nearby. |
| 476∼479 | Over-excavation of coal pillar side is serious, and the cross section is large and irregular. |
| 537∼541 | The roof is broken seriously, the displacement is large, and the flexible formwork wall has bulging problem. |
| 581 | Unanchoring of the third bolt from the bottom of the coal pillar side. |
| 583 | Unanchoring of the second bolt from the bottom of the coal pillar side. |
| 620 | The upper part of the flexible formwork wall bulges and cracks, and the third anchor bolt is removed from the bottom of the coal pillar side. |
| 630∼640 | Water accumulation in entry and floor cracking. |
| 652 | The upper part of the flexible formwork wall is bulging within 2 meters. |
|