Research Article

The Key Construction Technology Research on the Intercontinental Shanghai Wonderland

Table 6

Working conditions.

The time history curve no.Working conditionLoad combination

No. 1Working condition 1No. 1 seismic wave 1.0x + 0.85y
Working condition 2No. 1 seismic wave 0.85x + 1.0y

No. 2Working condition 3No. 2 seismic wave 1.0x + 0.85y
Working condition 4No. 2 seismic wave 0.85x + 1.0y

No. 3Working condition 5No. 3 seismic wave 1.0x + 0.85y
Working condition 6No. 3 seismic wave 0.85x + 1.0y