Study on Key Cost Drivers of Prefabricated Buildings Based on System Dynamics
Table 2
Basic equation parameters.
| Parameter | Values or ranges of values |
| Linear correlation coefficient between prefabrication rate and construction cost | 0.56 | Subsidies | 180 yuan/m2 | Design defect maximum | 5% | Transportation loss rate | 1% | Artificial rate | 1.084 | Mechanical rate | 0.0439 | Component storage cost coefficient | 0.4 | Component transportation cost coefficient | 0.21 yuan/piece·km | Mass equation coefficients , h, and k | 0.4, 0.8, 1 | Engineering quality level | [0, 1] | Degree of design standardization | [0, 1] | Capacity coefficient of the prefabricated component factory | [0, 1] | Information technology level | [0, 2] | Deepen design level | [0, 3] |
|
|