Research Article

Experimental Study on the Seismic Behavior of a Steel-Concrete Hybrid Structure with Buckling Restrained Braces

Figure 10

Construction process of the specimen. (a) Construction of the steel frame and wall skeleton. (b) Making the concrete wall. (c) Installation of the additional mass. (d) Installation of the BRB.
(a)
(b)
(c)
(d)