Experimental Study on Structural Form and Excavation Model of Urban Metro Cross Transfer Station with Super Large Cross Section and Shallow Excavation

Table 4

Principal stress of key points (kPa).

Measure pointLeft wall footLeft flank wallLeft arch footLeft arch waistVault

Double-side-wall heading excavation methodσ1−1,717.93544.55194.55279.42758.21
σ3−2,670.02−1,447.14−1,066.89−1,060.74−95.19
Cross rock beam + heading methodσ1−1,208.40157.54132.31175.28291.57
σ3−1,355.68−527.37−755.94−354.49−375.30