Research Article
Application of Comprehensive Geophysical Prospecting Method in Water Accumulation Exploration of Multilayer Goaf in Integrated Mine
Figure 5
Comparison of V(t)/I attenuation curves with turn-off time of 50us, 75us, and 90us. (a) 0–40 ms. (b) 0.01–100 ms.
(a) |
(b) |