Research Article
Numerical Analysis of Bearing Behavior of the Prebored Precast Pile with an Enlarged Base
Figure 1
Typical construction sequence of a PPEB pile. (a) Drilling. (b) Expanding base. (c) Grouting at the enlarged base. (d) Grouting along the pile shaft. (e) Inserting the precast pile (modified from [2]).