Research Article
The Construction Countermeasures of Shallow-Buried Small Spacing Tunnel Undercrossing Cultural Relic Buildings: A Case Study
Figure 10
First principal stress of aqueduct structure. (a) After the excavation of the left tunnel. (b) After the excavation of the right tunnel.
(a) |
(b) |