Research Article
The Construction Countermeasures of Shallow-Buried Small Spacing Tunnel Undercrossing Cultural Relic Buildings: A Case Study
Figure 11
Third principal stress of aqueduct. (a) After the excavation of the left tunnel. (b) After the excavation of the right tunnel.
| (a) |
| (b) |