Research Article

The Construction Countermeasures of Shallow-Buried Small Spacing Tunnel Undercrossing Cultural Relic Buildings: A Case Study

Figure 9

Settlement of aqueduct foundation. (a) After the excavation of the left tunnel. (b) After the excavation of the right tunnel.
(a)
(b)