Research Article

The Construction Countermeasures of Shallow-Buried Small Spacing Tunnel Undercrossing Cultural Relic Buildings: A Case Study

Table 3

Support parameter value.

NameMaterialElastic modulus (GPa)Poisson’s ratioVolumetric weight (kN/m3)Cross sectionGeometry (m)

Temporary supportC25 sprayed concrete27.60.2525RectangleH0.20
B1.0

Initial supportC25 sprayed concrete28.30.2525RectangleH0.26
B1.0

Secondary lining (including inverted arch)Reinforced concrete310.225RectangleH0.60
B1.0