Research Article
Deformation Response and Safety Evaluation of Buildings Affected by Subway-Station Construction
Table 4
Main excavated conditions of the foundation pit.
| | Construction step | Construction content | Excavation depth |
| | I | Initial ground stress | — | | II | Retaining structure construction | — | | III | Excavate the first layer of soil and set up the first steel support | 2 m | | IV | Excavate the second layer of soil and set up the second steel support | 4.5 m | | V | Excavate the third layer of soil and set up the third steel support | 4.5 m | | VI | Excavate the fourth layer of soil and set up the fourth steel support | 4.5 m | | VII | Excavation to the bottom | 4.5 m |
|
|