Structure peak response of climbing formwork under the climbing condition.

Working conditionMaximum von Mises stress (N/mm2)Position of maximum stressMaximum displacement (mm)Position of maximum displacement

CLC-CM170Joint of the beam of tripod and the guide rail223Top of the outer pole of upper platform
CLC-TD173Joint of the beam of tripod and the guide rail340Top of the outer pole of upper platform
CLC-AR172Joint of the beam of tripod and the guide rail243Top of the outer pole of upper platform
CL-CM171Joint of the beam of tripod and the guide rail71.2Top of the outer pole of upper platform
CL-TD172Joint of the beam of tripod and the guide rail70.0Top of the outer pole of upper platform
CL-AR165Joint of the beam of tripod and the guide rail67.6Top of the outer pole of upper platform