Research Article
Dynamic Characteristics and Time-History Analysis of Hydraulic Climbing Formwork for Seismic Motions
Table 9
Structure peak response of climbing formwork under the climbing condition.
| Working condition | Maximum von Mises stress (N/mm2) | Position of maximum stress | Maximum displacement (mm) | Position of maximum displacement |
| CLC-CM | 170 | Joint of the beam of tripod and the guide rail | 223 | Top of the outer pole of upper platform | CLC-TD | 173 | Joint of the beam of tripod and the guide rail | 340 | Top of the outer pole of upper platform | CLC-AR | 172 | Joint of the beam of tripod and the guide rail | 243 | Top of the outer pole of upper platform | CL-CM | 171 | Joint of the beam of tripod and the guide rail | 71.2 | Top of the outer pole of upper platform | CL-TD | 172 | Joint of the beam of tripod and the guide rail | 70.0 | Top of the outer pole of upper platform | CL-AR | 165 | Joint of the beam of tripod and the guide rail | 67.6 | Top of the outer pole of upper platform |
|
|