Research Article

Equivalent Resilient Modulus Inversion and Calculation of Different Asphalt Pavement Structures

Table 1

The structure of the test section.

Pavement structureS1 (semirigid structure)S2 (inverted structure 1)S3 (inverted structure 2)

The asphalt mastic macadam SMA upper surface layer (cm)4
The SBS modified asphalt AC-20C middle surface layer (cm)6
The lower surface layerThe typeAsphalt AC-20CThe SBS modified asphalt AC-20CATB-25
The thickness (cm)8812
The graded crushed stone transition layer (cm)—12
The cement stabilized crushed stone base (cm)2820
The cement stabilized crushed stone subbase (cm)282420
The graded crushed stone cushion layer (cm)151515
The total pavement thickness (cm)898989