Research Article
Research on Dynamic Stability Optimization of Rock Spreader considering Prevention of Geological Subsidence and Local Collapse in Reclamation Area
Table 2
The load and working condition combination of receiving boom.
| | Load type | Name | Size (N) | Type of working condition |
| | Basic load | Deadweight of receiving boom | 359170 | I | II | III | | Conveyor belt | 75000 | ✓ | ✓ | ✓ | | Roller | 77700 | ✓ | ✓ | ✓ | | Materials | 158500 | | ✓ | ✓ | | Walking platform and railings | 128800 | ✓ | ✓ | ✓ | | Buffer bed and receiving chute | 87390 | ✓ | ✓ | ✓ | | Discharging chute | 37990 | ✓ | ✓ | ✓ | | Head roller and driving device | 69830 | ✓ | ✓ | ✓ | | Tail roller and tightening device | 29830 | ✓ | ✓ | ✓ |
| | Additional load | Wind load | 10428 | | ✓ | ✓ |
| | Special loads | Seismic load | | | | ✓ |
|
|