Research Article
Temperature Control Technology for Construction of Jinsha River Bridge
Table 3
Temperature calculation results.
| Position | Layer | Temperature of casting concrete (°C) | Peak temperature (°C) | Time of peak temperature (h) | Temperature rise value (°C) | Temperature difference between inside and outside (°C) |
| Cap | First-layer concrete | 24 | 54.1 | 48 | 30.1 | 16.1 | Second-layer concrete | 24 | 55.4 | 48 | 31.4 | 17.4 | Tower base | First-layer concrete | 26 | 61.8 | 48 | 35.8 | 18.5 |
|
|