Research Article

Temperature Control Technology for Construction of Jinsha River Bridge

Table 4

Stress calculation results.

PositionLayerMaximum principal tensile stress at heating stageMaximum principal tensile stress at cooling stage
Stress value (MPa)Concrete age (d)Allowable stress (MPa)Safety factorStress value (MPa)Concrete age (d)Allowable stress (MPa)Safety factor

CapFirst-layer concrete2.022.52.441.211.33103.162.38
Second-layer concrete1.862.52.441.312.01103.161.57
Tower baseFirst-layer concrete2.292.52.711.181.77103.451.95