Research Article

Temperature Control Technology for Construction of Jinsha River Bridge

Table 5

Temperature control standard of cap.

Serial numberTemperature control itemControl standardBasis

1Pouring temperature of concrete≤26°CConstruction conditions and calculation results of temperature control
2Maximum internal temperature of concrete≤65°C《Code for construction of mass concrete》 (GB 50496-2018); 《code for construction of concrete structures》 (GB50666-2011); calculation results of temperature control
3Temperature difference between inside and outside of concrete (including equivalent temperature of concrete shrinkage)≤20°C
4Cooling rate inside casting concrete≤2.0°C/d
5Temperature difference between surface and atmosphere of pouring concrete≤20°C
6Temperature difference between inlet and outlet of cooling water≤10°C《Technical code for construction of highway bridges and culverts》 (JTG/TF50-2011)
7The temperature difference between the cooling water and the inside concrete when the water is first supplied or resupplied after interruption≤25°C《Technical specification for temperature crack control of mass concrete in water transport engineering》 (JTS 202-1-2010)
8Temperature difference between curing water and concrete surface≤15°C