Research Article

Temperature Control Technology for Construction of Jinsha River Bridge

Table 6

Analysis of measured results of cap temperature.

Serial numberTemperature control itemControl standardMeasured value of first pouring (°C)Measured value of second pouring (°C)

1Temperature of pouring concrete≤26°C25∼3024∼28.5
2Maximum temperature of internal concrete≤65°C64.561.6
3Temperature difference between the inner surface of concrete pouring body (including equivalent temperature of concrete shrinkage)≤28°C26.624.6
4The rate of cooling of inside concrete≤2.0°C/d2.11.98
5Temperature difference between surface of concrete and atmosphere≤20°C16.117.1
6Temperature difference between inlet and outlet of cooling water≤10°C9.8
7The temperature difference between the cooling water and the inside concrete when the water is first supplied or resupplied after interruption≤25°C24.8
8Temperature difference between curing water and concrete surface≤15°CTrueTrue