Research Article
Numerical Study on the Influence of Profile Shape on the Stability of a Nonhomogeneous Slope
Figure 11
Steep end-slope mining schemes. (a) Scheme I merges the bottom 3 steps. (b) Scheme II merges the bottom 5 steps. (c) Scheme III merges the upper-middle 3 steps. (d) Scheme IV merges the lower-middle 3 steps. (e) Scheme V merges 7 steps in different positions.
| (a) |
| (b) |
| (c) |
| (d) |
| (e) |