Research Article

Numerical Study on the Influence of Profile Shape on the Stability of a Nonhomogeneous Slope

Figure 11

Steep end-slope mining schemes. (a) Scheme I merges the bottom 3 steps. (b) Scheme II merges the bottom 5 steps. (c) Scheme III merges the upper-middle 3 steps. (d) Scheme IV merges the lower-middle 3 steps. (e) Scheme V merges 7 steps in different positions.
(a)
(b)
(c)
(d)
(e)