Research Article
Early Warning for the Construction Safety Risk of Bridge Projects Using a RS-SSA-LSSVM Model
Table 12
Results determined from 1,000 repeated calculations of different variable screening methods.
| Warning degree | The proposed model | The SSA-LSSVM with the correlation analysis | The SSA-LSSVM with MIV | Predicted | Rate of errors (%) | Predicted | Rate of errors (%) | Predicted | Rate of errors (%) |
| I | 27.531 | 1.97 | 29.411 | 8.91 | 26.242 | 2.81 | II | 33.524 | 1.40 | 39.036 | 14.8 | 34.654 | 1.92 | III | 7.944 | 0.70 | 10.381 | 29.8 | 8.091 | 1.14 | IV | 3.001 | 0.03 | 3.172 | 5.73 | 3.013 | 0.43 |
|
|