Research Article

Early Warning for the Construction Safety Risk of Bridge Projects Using a RS-SSA-LSSVM Model

Table 12

Results determined from 1,000 repeated calculations of different variable screening methods.

Warning degreeThe proposed modelThe SSA-LSSVM with the correlation analysisThe SSA-LSSVM with MIV
PredictedRate of errors (%)PredictedRate of errors (%)PredictedRate of errors (%)

I27.5311.9729.4118.9126.2422.81
II33.5241.4039.03614.834.6541.92
III7.9440.7010.38129.88.0911.14
IV3.0010.033.1725.733.0130.43