Original data of the case studies.

Secondary indicator123456371372

A110.4241.2230.8720.3132.3424.8730.2910.742
A129.5832.1354.2933.4215.2312.1230.2341.882
A1393.2190.3185.7489.0779.4295.2576.4889.25
A1486.2572.5583.8594.2569.3586.6579.9568.55
A211.4510.8322.4255.3173.4272.5120.9820.428
A2212.4810.420.3424.1240.52316.253.4117.234
A2325.2518.149.41317.9424.314.5107.2235.861
A244.1129.3792.3450.5124.2942.5120.3163.184
A3198.1297.5298.6599.0596.5994.5098.5299.50
A3299.5298.9599.7499.3999.4797.5298.8399.05
A3384.7574.4586.2569.1548.5586.0579.5573.45
A3438.5575.2565.8542.4565.2562.8558.2579.45
A4167.5574.2585.6575.3579.3578.7584.7578.35
A4285.2579.3595.2572.1585.4569.2578.4583.65
A4398.4199.5895.2596.2397.1495.4299.7498.68
A442530304525403520
A512.352.352.352.352.352.5202.5202.520
A5257754946
A5368.3584.2560.5575.3582.4548.9568.4584.25
A5475.2590.4584.5578.0568.7525.4570.2589.35
Warning degreeIIIIIIIIIIIIIII