Research Article
Early Warning for the Construction Safety Risk of Bridge Projects Using a RS-SSA-LSSVM Model
Table 4
Reliability analysis of the qualitative indicators.
| Secondary indicator | A14 | A33 | A34 | A41 |
| Cronbachs’α | 0.704 | 0.823 | 0.734 | 0.785 | Result | Pass | Pass | Pass | Pass | Secondary indicator | A42 | A53 | A54 | - | Cronbachs’α | 0.824 | 0.864 | 0.723 | - | Result | Pass | Pass | Pass | - |
|
|