Research Article

Early Warning for the Construction Safety Risk of Bridge Projects Using a RS-SSA-LSSVM Model

Table 7

Results of the early-warning model proposed in this study.

Warning degreeActual warning degreeThe model proposed in this study
Predicted warning degreeRate of prediction errors (%)

I27283.70
II34332.94
III880.00
IV330.00