Research Article

Early Warning for the Construction Safety Risk of Bridge Projects Using a RS-SSA-LSSVM Model

Table 8

Average value of the 1000 early warning results of different models.

Warning degreeActualPredictedRate of errors (%)PredictedRate of errors (%)PredictedRate of errors (%)

The proposed modelThe proposed model without RSLSSVM
I2727.5311.9725.0247.3216.95237.2
II3433.5241.4036.0846.1342.08423.8
III87.9440.707.8402.008.7168.95
IV33.0010.033.0521.734.24841.6

SSA-BPPSO-LSSVMPSO-BP
I2736.72336.021.41420.734.48233.5
II3426.52122.036.4987.3526.56721.9
III85.66729.210.03625.457.01112.4
IV33.08929.74.05249.23.9403.13