Research Article
Early Warning for the Construction Safety Risk of Bridge Projects Using a RS-SSA-LSSVM Model
Table 8
Average value of the 1000 early warning results of different models.
| Warning degree | Actual | Predicted | Rate of errors (%) | Predicted | Rate of errors (%) | Predicted | Rate of errors (%) |
| | | The proposed model | The proposed model without RS | LSSVM | I | 27 | 27.531 | 1.97 | 25.024 | 7.32 | 16.952 | 37.2 | II | 34 | 33.524 | 1.40 | 36.084 | 6.13 | 42.084 | 23.8 | III | 8 | 7.944 | 0.70 | 7.840 | 2.00 | 8.716 | 8.95 | IV | 3 | 3.001 | 0.03 | 3.052 | 1.73 | 4.248 | 41.6 |
| | | SSA-BP | PSO-LSSVM | PSO-BP | I | 27 | 36.723 | 36.0 | 21.414 | 20.7 | 34.482 | 33.5 | II | 34 | 26.521 | 22.0 | 36.498 | 7.35 | 26.567 | 21.9 | III | 8 | 5.667 | 29.2 | 10.036 | 25.45 | 7.011 | 12.4 | IV | 3 | 3.089 | 29.7 | 4.052 | 49.2 | 3.940 | 3.13 |
|
|