Early Warning for the Construction Safety Risk of Bridge Projects Using a RS-SSA-LSSVM Model

Table 9

Average calculation time and standard deviation of 1000 calculations.

ModelThe proposed modelThe proposed model without RSLSSVMSSA-BPNNPSO-LSSVMPSO-BPNN

Average calculation time (s)3.2413.8260.9374.8564.6425.752
Standard deviation of I0.003050.005240.022210.005520.012450.01046
Standard deviation of II0.007310.007930.025970.007230.022130.01475
Standard deviation of III0.006450.008300.024240.014200.041740.09422
Standard deviation of IV0.010230.013840.045520.015250.014630.02425