Journals
Publish with us
Publishing partnerships
About us
Blog
Advances in Civil Engineering
Journal overview
For authors
For reviewers
For editors
Table of Contents
Special Issues
Advances in Civil Engineering
/
2021
/
Article
/
Tab 4
/
Research Article
Research and Analysis on the Influence of Small Clear Distance Drilling and Blasting Method on the Existing Tunnel Structure
Table 4
Maximum vibration velocity component of monitoring points at tunnel vault.
Monitoring location
Vibration (cm/s)
X
direction
Y
direction
Z
direction
Vault (ZK1 + 252)
8.17
4.73
6.85