Research Article

Crane Lifting Optimization and Construction Monitoring in Steel Bridge Construction Project Based on BIM and UAV

Figure 9

Reconstruction of the construction site by UAV, with three steps. (a) Triangular meshing. (b) Shaded relief. (c) Texture mapping.
(a)
(b)
(c)