Research Article
Crane Lifting Optimization and Construction Monitoring in Steel Bridge Construction Project Based on BIM and UAV
Figure 9
Reconstruction of the construction site by UAV, with three steps. (a) Triangular meshing. (b) Shaded relief. (c) Texture mapping.
(a) |
(b) |
(c) |