Research Article

Prioritization of Bridges to Improve Emergency Road Network Performance after the Earthquake

Table 11

Sampling method.

Type of cumulative failure methodSampling approachNumber of samplesSample’s percentage% cumulative occurrence probability% error (distance from the total length optimal value)

The number of usable bridgesOne usable and less61911.522.20
Two usable and less165038.601.63
Three usable and less268173.480.36
Four usable and less319794.960.08
Five usable and less32100100.000.00

The probability of occurrence“Very high” occurrence2615.120.60
“High” to “very high” occurrence82545.360.60
“Medium” to “very high” occurrence165072.000.60
“Low” to “very high” occurrence247589.440.48
“Very low” to “very high” occurrence (all)32100100.000.00