Research Article
Chloride Ion Corrosion Pattern and Mathematical Model for C60 High-Strength Concrete after Freeze-Thawing Cycles
Figure 7
Cloud plots of initial porosity distribution of concrete after freeze-thawing. (a) (n) = 0. (b) (n) = 3. (c) (n) = 60. (d) (n) = 90.
| (a) |
| (b) |
| (c) |
| (d) |