Classification of hazardous areas in deep foundation pit construction site.
| | Type of accident | Hazardous area |
| | Collapse | Pit edge | 1.2 m from foundation pit edge | | Foundation pit support | The inspection is qualified, and the lack of the latest safety inspection record is regarded as a hazardous area | | Scaffold | The inspection is qualified, and the lack of the latest safety inspection record is regarded as a hazardous area |
| | Falling from a height | Manual digging pile hole | 1 m from the edge of the orifice | | The edge of the hole | 0.6 m from the edge of the hole | | Scaffolding formwork | Coverage of formwork collapse | | Tower crane use | The range of the circle is centred on the hanging object, and the instantaneous reaction distance of the person is the radius |
| | Object strike | Support erection | The inspection is qualified, and the lack of the latest safety inspection record is regarded as a hazardous area | | Scaffolding | The inspection is qualified, and the lack of the latest safety inspection record is regarded as a hazardous area | | Tower crane use | Plane projection area | | Tower crane | Detecting tower crane speed, with overspeed being considered unsafe area | | Formwork | Demolishing area |
| | Mechanical injury | Crane | Plane projection area | | Concrete pumps | Work area and moving route | | Other moving equipment or machine | Work area and moving route |
| | Adjacent environment damage | Crane | The maximum range of the circle centred on the hanging object | | Support system | Retaining structure or other support element |
|
|