Safety Management System Prototype/Framework of Deep Foundation Pit Based on BIM and IoT
Table 1
Classification of hazardous areas in deep foundation pit construction site.
| Type of accident | Hazardous area |
| Collapse | Pit edge | 1.2 m from foundation pit edge | Foundation pit support | The inspection is qualified, and the lack of the latest safety inspection record is regarded as a hazardous area | Scaffold | The inspection is qualified, and the lack of the latest safety inspection record is regarded as a hazardous area |
| Falling from a height | Manual digging pile hole | 1 m from the edge of the orifice | The edge of the hole | 0.6 m from the edge of the hole | Scaffolding formwork | Coverage of formwork collapse | Tower crane use | The range of the circle is centred on the hanging object, and the instantaneous reaction distance of the person is the radius |
| Object strike | Support erection | The inspection is qualified, and the lack of the latest safety inspection record is regarded as a hazardous area | Scaffolding | The inspection is qualified, and the lack of the latest safety inspection record is regarded as a hazardous area | Tower crane use | Plane projection area | Tower crane | Detecting tower crane speed, with overspeed being considered unsafe area | Formwork | Demolishing area |
| Mechanical injury | Crane | Plane projection area | Concrete pumps | Work area and moving route | Other moving equipment or machine | Work area and moving route |
| Adjacent environment damage | Crane | The maximum range of the circle centred on the hanging object | Support system | Retaining structure or other support element |
|
|