Research Article

A Novel Excavation and Construction Method for an Extra-Long Underwater Tunnel in Soft Soils

Figure 10

Development of the horizontal movements of the longitudinal DSSPs during construction. (a) On the north side of Zone #1 and (b) on the south side of Zone #1.
(a)
(b)