Research Article
A Novel Excavation and Construction Method for an Extra-Long Underwater Tunnel in Soft Soils
Figure 12
Lateral deflection of bored piles along depth. (a) Development of deflections at B36 and (b) maximum deflections at B2, B5, B8, B33, and B36.
(a) |
(b) |