Research Article
A Novel Excavation and Construction Method for an Extra-Long Underwater Tunnel in Soft Soils
Figure 15
Distribution of the vertical movements at the top of bored piles. (a) On the north side of Zone #1 and (b) on the south side of Zone #1.
| (a) |
| (b) |