Research Article

A Novel Excavation and Construction Method for an Extra-Long Underwater Tunnel in Soft Soils

Figure 15

Distribution of the vertical movements at the top of bored piles. (a) On the north side of Zone #1 and (b) on the south side of Zone #1.
(a)
(b)