Research Article

A Novel Excavation and Construction Method for an Extra-Long Underwater Tunnel in Soft Soils

Figure 4

Schematic diagram of the novel construction method. (a) Step 1, (b) Step 2, (c) Step 3, (d) Step 4, and (e) Step 5.